This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 885    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
885  DY032   2015     Richard Lampitt   Dan Comben   RRS Discovery   PAP

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  885
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed View SME. Help icon.
Cost SME Closed Profile owner may log in and view SME Costing. Help icon.
Create Programme Closed View 2015 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete.
View Cruise Track.
Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  885
DY032
RRS Discovery
18Days
PAP
Profile (885)
View SME
Lampitt
NOC
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
18-06-2015 20-06-2015 08-07-2015 08-07-2015
MobPort Sail Port Mid Port Dock Port DeMob Port
GBLIV GBLIV GBSOU GBSOU

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  885
Chemistry : Laboratory fume hood.
Laboratory laminar flow hoods.
Laboratory liquid nitrogen generator.
Laboratory pure water system (Millipore).
Liquid scintillation counter.
Seismics/Echo Sounders/Coring : Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Mega corer.
OTSB trawl systems.
SMBA box corer: stainless steel (500mm square box).
Sound velocity probe.
Sub-bottom profiler (3.5 kHz echo sounder).
Deep Platforms :
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
Moorings & mooring instrumentation
Salinometer.
Stand alone pumps (SAP).
Miscellaneous : -20 degree centigrade freezer.
-85 degree centigrade freezer.
Ice making machine.
Refrigerators.
User supplied laboratory container.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.
Ultra short base line (USBL) acoustic navigation system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  885
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
Road freight 2 off 44ft flat bed trucks GBSOU NOC 17-06-2015GBLIV18-06-2015

TABLE  :  COLLATERAL FILES  -  for PROFILE  885
System File Name Re/load Delete Uploaded File
  AdditionalUploadsQueOne No access No access UVP_LISST_LOPC_HPBs_MIO_2.docx.doc  
  CruiseMapOne No access No access pap_site.JPG  
  DeckPlan No access No access After_Deck_Layout_DY032_1b_Model_1.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  885
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    Box Coring Rev2 UKORS OPS Box_Coring_Rev2_complete.doc
    CTD Operations Rev 5 UKORS OPS CTD_Operations_Rev_5_complete.doc
    Liquid Nitrogen generator Rev 3 UKORS OPS Liquid_Nitrogen_generator_Rev_3_complete.doc
    Megacorer Rev0 UKORS OPS Megacorer_Rev0_complete.doc
    Millipore Rev 4 UKORS OPS Millipore_Rev_4_complete.doc
    Millipore Rev 4-coshh UKORS OPS Millipore_Rev_4-coshh_complete.doc
    Moorings Operation Rev2 UKORS OPS Moorings_Operation_Rev2_complete.doc
    ODAS Bouy recovery Rev1 UKORS OPS ODAS_Bouy_recovery_Rev1_complete.doc
    OTSB Trawling Rev 3 UKORS OPS OTSB_Trawling_Rev_3_complete.doc
    Stand Alone Pumps (SAPs) Rev 3 UKORS OPS Stand_Alone_Pumps_(SAPs)_Rev_3_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  885
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access DY032_PCA.pdf  
  Ships Cruise Debrief No access DY32_Post_cruise_debrief_meeting_060715.pdf  
Top
Spacer.