This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 757 [2]    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


This is a child Profile of a multiple cruise profile which includes - 757 [1] 757 [2]

Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
757 [2]  DY021   2014     Malcolm Woodward   Dan Comben   RRS Discovery   SSB1

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  757 [2]
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed Please refer to parent - [here]. Help icon.
Cost SME Closed This is a Multi-Profile. Help icon.
Create Programme Closed View 2014 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete.
View Cruise Track.
Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  757 [2]
DY021
RRS Discovery
25Days
SSB1
Profile
(757 [2])
View Parent SME
Woodward
Plymouth Marine Laboratory
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
26-02-2015 01-03-2015 26-03-2015 26-03-2015
MobPort Sail Port Mid Port Dock Port DeMob Port
GBSOU GBSOU GBSOU GBSOU

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  757 [2]
Chemistry : Clean chemistry laboratory container.
General purpose chemistry laboratory container.
Laboratory fume hood.
Laboratory laminar flow hoods.
Laboratory liquid nitrogen generator.
Laboratory pure water system (Millipore).
Underway water sampling system (trace metal spec).
Seismics/Echo Sounders/Coring : Day grab.
Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Mega corer.
SMBA box corer: stainless steel (500mm square box).
Sub-bottom profiler (3.5 kHz echo sounder).
Deep Platforms : Autosub
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
CTD/rosette sampler systems (Titanium).
Salinometer.
Miscellaneous : -20 degree centigrade freezer.
-85 degree centigrade freezer.
Gas bottle storage racks.
Refrigerators.
User supplied laboratory container.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.
Ultra short base line (USBL) acoustic navigation system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  757 [2]
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  757 [2]
System File Name Re/load Delete Uploaded File
  AdditionalUploadsQueOne No access No access SM028_Smart_Buoy_and_Guard_Buoy_Deployment_and_Recovery_Operations_JK_081213.pdf  
  DeckPlan No access No access DY021_Draft_DP.pdf  
  GeneralInformationFive No access No access Fume_Cupboard_Chemicals_for_SSB_cruises_2015.docx.doc  
  GeneralInformationFour No access No access Voyager_2_flume_load_test.pdf  
  GeneralInformationOne No access No access MPM_MAS_MOS_SOP_105_Lander_Deployments_120125_.pdf  
  GeneralInformationThree No access No access L4000_111_FULL_ASSY.pdf  
  GeneralInformationTwo No access No access mini_stable_II_frame.jpg  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  757 [2]
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    Autosub6000 Rev0 UKORS OPS Autosub6000_Rev0_complete.doc
    Box Coring Rev2 UKORS OPS Box_Coring_Rev2_complete.doc
    CTD Operations Rev 5 UKORS OPS CTD_Operations_Rev_5_complete.doc
    Dredging Equipment Rev 2 UKORS OPS Dredging_Equipment_Rev_2_complete.doc
    Emergency Grapnel Recovery Rev1 UKORS OPS Emergency_Grapnel_Recovery_Rev1_complete.doc
    Gas Generators Rev 3 UKORS OPS Gas_Generators_Rev_3_complete.doc
    Liquid Nitrogen generator Rev 3 UKORS OPS Liquid_Nitrogen_generator_Rev_3_complete.doc
    Megacorer Rev0 UKORS OPS Megacorer_Rev0_complete.doc
    Millipore Rev 4 UKORS OPS Millipore_Rev_4_complete.doc
    Millipore Rev 4-coshh UKORS OPS Millipore_Rev_4-coshh_complete.doc
    Stand Alone Pumps (SAPs) Rev 3 UKORS OPS Stand_Alone_Pumps_(SAPs)_Rev_3_complete.doc
    UMFS (TMS) Rev 2 UKORS OPS UMFS_(TMS)_Rev_2_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  757 [2]
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access No_Post_Cruise_Assessment.docx.doc  
  Ships Cruise Debrief No access File not loaded.
Top
Spacer.