This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 293 [2]    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


This is a child Profile of a multiple cruise profile which includes - 293 [1] 293 [2]

Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
293 [2]  JC114   2014     Richard Hobbs   Jonathan Short   RRS James Cook   Costa Rica Rift

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  293 [2]
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed Please refer to parent - [here]. Help icon.
Cost SME Closed This is a Multi-Profile. Help icon.
Create Programme Closed View 2014 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete. Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  293 [2]
JC114
RRS James Cook
45Days
Costa Rica Rift
Profile
(293 [2])
View Parent SME
Hobbs
Durham University
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
20-01-2015 22-01-2015 08-03-2015 08-03-2015
MobPort Sail Port Mid Port Dock Port DeMob Port
CRCAL CRCAL PABLB PABLB

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  293 [2]
Chemistry :  
Seismics/Echo Sounders/Coring : Bolt 1500LL seismic airguns.
Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Gravity meters.
Magnetometers.
Multi-channel seismic systems.
Seismic compressor container.
Sound velocity probe.
Sub-bottom profiler (3.5 kHz echo sounder).
Deep Platforms :  
Sensors and Moorings : Moorings & mooring instrumentation
XBT operations.
Miscellaneous : User supplied storage container.
Ship Fitted Equipment : Seismic air compressor.
Ship scientific computing systems.
SIMRAD EM120 swath bathymetry system.
SIMRAD SBP 120 sub bottom profiler (3°).
SPD11 dynamic positioning system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  293 [2]
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  293 [2]
System File Name Re/load Delete Uploaded File
  AdditionalUploadsAgrOne No access No access OSCAR_hydrophone1_a4.pdf  
  AdditionalUploadsQueOne No access No access detail_720.jpg  
  AdditionalUploadsQueThree No access No access Cook-Sonne-SAP-configuration.jpg  
  AdditionalUploadsQueTwo No access No access plan_720.jpg  
  DeckPlan No access No access JC114_Deck_Plan.pdf  
  GeneralInformationOne No access No access JC114_aquisition_plan.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  293 [2]
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    No Risk Assessments have been assigned.

TABLE  :  POST CRUISE REPORT  -  for PROFILE  293 [2]
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access JC114_Post_Cruise_Assessment.pdf  
  Ships Cruise Debrief No access File not loaded.
Top
Spacer.