This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 774 [2]    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


This is a child Profile of a multiple cruise profile which includes - 774 [1] 774 [2]

Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
774 [2]  DY039   2015     Darren Rayner   Jonathan Short   RRS Discovery   RAPID

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  774 [2]
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed Please refer to parent - [here]. Help icon.
Cost SME Closed This is a Multi-Profile. Help icon.
Create Programme Closed View 2015 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete.
View Cruise Track.
Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  774 [2]
DY039
RRS Discovery
45Days
RAPID
Profile
(774 [2])
View Parent SME
Rayner
NOCS
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
13-10-2015 17-10-2015 24-10-2015 01-12-2015 01-12-2015
MobPort Sail Port Mid Port Dock Port DeMob Port
GBSOU GBSOU ESSCT BSNAS BSNAS

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  774 [2]
Chemistry : Laboratory nitrogen gas generators.
Laboratory pure water system (Millipore).
Seismics/Echo Sounders/Coring : Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Deep Platforms :  
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
Moorings & mooring instrumentation
Salinometer.
SC ADCP RDI WH long ranger 75kHz (1500m).
Miscellaneous : -20 degree centigrade freezer.
Refrigerators.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship Dynamic Positioning System.
Ship scientific computing systems.
SIMRAD EA600/EA640 12 kHZ single beam echo sounder.
SIMRAD EK60 echo sounder.
SIMRAD EM122 swath bathymetry system.
WAMOS wave radar

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  774 [2]
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  774 [2]
System File Name Re/load Delete Uploaded File
  DeckPlan No access No access DY039_Deck_Plan.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  774 [2]
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    CTD Operations Rev 5 UKORS OPS CTD_Operations_Rev_5_complete.doc
    Mooring Recovery Rev 1 UKORS OPS Mooring_Recovery_Rev_1_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  774 [2]
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access DY039_completed_PostCruiseAssessment.pdf  
  Ships Cruise Debrief No access File not loaded.
  Post Cruise Reveiw Log No access DY039_Post_Cruise_Assessment_Review_and_Action_Log.pdf  
  Other No access File not loaded.
Top
Spacer.