Active Profile  : 751    Stage    :  BODC Cruise Summary Report
Last  :  The raw data sets have been submitted by the Cruise Manager.

Next  :  BODC acknowledges receipt of the Cruise Summary Report from the PI.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


LATEST INFORMATION

PUBLIC  :
HV supplies for JC138:
For JC138 the DASI control container is planned to be located in the hangar with suitable HV connections provided in a modified hangar HV JB. The overall HV capability of the ships scientific support systems will be modified to support the use of DASI and Hybis on the same cruise.

Following a meeting between Aitken, Alan B, Dave T, Ian Tan, Colin, Matt the following actions were proposed:

Aitken/Alan to progress the following ship installation modifications:
1. The DASI control container will be located in the hangar and the DASI HV cabling will connect to a suitably modified hangar HV JB, through to the main laboratory HV JB, and directly through to the winch room.
2. The main laboratory HV cage installation will be suitably modified to link the two HV connection boxes to support the linking of the hangar, main laboratory and winch room connections.

Provision and review of SSOW:
Ian will provide a SSOW for DASI operations, Dave will provide SSOW for Hybis operations and Aitken will provide SSOW for the ships systems. These SSOW will need to be reviewed by Aitken/ships staff to ensure they effectively and safely support each other’s operational requirements.

Use of deep tow cable:
There are two other items of 3rd party equipment to be embarked; GEOMAR Coil and Sputnik EM equipment, these will need to be assessed to ensure their electrical requirements are compatible with the ship fitted deep tow cable. The mechanical terminations for these items will also need to be confirmed.

Deck plan:
Deck plan to be produced and distributed at early point to ensure there is no issue with the DASI lab container location within the hangar causing conflict with other embarked equipment.

Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
751  JC138   2016     Bramley Murton   Matt Tiahlo   RRS James Cook   Blue Mining

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  751
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed View SME. Help icon.
Cost SME Closed Profile owner may log in and view SME Costing. Help icon.
Create Programme Closed View 2016 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report BODC Next : Waiting for the PI's Cruise Summary Report. Help icon.
Final Cruise Report BODC Help icon.
Post Cruise Reports NMF-SS Help icon.
Complete NMF-SS Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  751
JC138
RRS James Cook
47Days
Blue Mining
Profile (751)
View SME
Murton
NOC
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
08-07-2016 08-07-2016 24-08-2016 24-08-2016
MobPort Sail Port Mid Port Dock Port DeMob Port
PTPDL PTPDL GBFAL GBFAL

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  751
Chemistry : Laboratory fume hood.
Laboratory nitrogen gas generators.
Laboratory pure water system (Millipore).
Seismics/Echo Sounders/Coring : Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Gravity core.
Mega corer.
SMBA box corer: stainless steel (500mm square box).
Sound velocity probe.
Deep Platforms : Shrimp platform.
Sensors and Moorings :
Miscellaneous : -20 degree centigrade freezer.
Cold storage container.
Ice making machine.
Refrigerators.
User supplied storage container.
Ship Fitted Equipment : Gas distribution system to laboratory.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.
SIMRAD EA600/EA640 12 kHZ single beam echo sounder.
SIMRAD EM120 swath bathymetry system.
SIMRAD SBP 120 sub bottom profiler (3°).
SPD11 dynamic positioning system.
Ultra short base line (USBL) acoustic navigation system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  751
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  751
System File Name Re/load Delete Uploaded File
  AdditionalUploadsAgrOne No access No access 15mSeabedRockdrillJET.pdf  
  CruiseMapOne No access No access cruisemap.jpg  
  DeckPlan No access No access JC138_Deck_Plan.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  751
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    No Risk Assessments have been assigned.

TABLE  :  POST CRUISE REPORT  -  for PROFILE  751
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access JC_138_PCA.pdf  
  Ships Cruise Debrief No access File not loaded.
  Post Cruise Reveiw Log No access JC138_Post_Cruise_Assessment_Review_Log.pdf  
  Other No access File not loaded.
Top
Spacer.