This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 741    Stage    :  Final Cruise Report
Last  :  The PI's Cruise Summary Report has been uploaded.

Next  :  BODC acknowledges receipt of the Final Cruise Report from the PI.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
741  DY030   2015     Gary Fones   Dan Comben   RRS Discovery   SSB 3

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  741
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed View SME. Help icon.
Cost SME Closed Profile owner may log in and view SME Costing. Help icon.
Create Programme Closed View 2015 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report BODC Next : Waiting for the PI's Final Cruise Report. Help icon.
Post Cruise Reports NMF-SS Help icon.
Complete NMF-SS Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  741
DY030
RRS Discovery
21Days
SSB 3
Profile (741)
View SME
Fones
University Of Portsmouth
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
01-05-2015 04-05-2015 25-05-2015 25-05-2015
MobPort Sail Port Mid Port Dock Port DeMob Port
GBSOU GBSOU GBSOU GBSOU

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  741
Chemistry : Clean chemistry laboratory container.
General purpose chemistry laboratory container.
Laboratory fume hood.
Laboratory laminar flow hoods.
Laboratory liquid nitrogen generator.
Laboratory pure water system (Millipore).
Underway water sampling system (trace metal spec).
Seismics/Echo Sounders/Coring : Day grab.
Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Mega corer.
SMBA box corer: stainless steel (500mm square box).
Sub-bottom profiler (3.5 kHz echo sounder).
Deep Platforms : Autosub
Underwater gliders
Sensors and Moorings : CI FASTRACKA FRRF.
CTD/rosette sampler systems (Stainless Steel).
CTD/rosette sampler systems (Titanium).
Salinometer.
Stand alone pumps (SAP).
Miscellaneous : -20 degree centigrade freezer.
-85 degree centigrade freezer.
Gas bottle storage racks.
Refrigerators.
User supplied laboratory container.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.
Ultra short base line (USBL) acoustic navigation system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  741
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  741
System File Name Re/load Delete Uploaded File
  AdditionalUploadsQueFive No access No access Voyager_2_flume_load_test.pdf  
  AdditionalUploadsQueFour No access No access MPM_MAS_MOS_SOP_105_Lander_Deployments_120125_.pdf  
  AdditionalUploadsQueOne No access No access L4000_111_FULL_ASSY.pdf  
  AdditionalUploadsQueThree No access No access SM028_Smart_Buoy_and_Guard_Buoy_Deployment_and_Recovery_Operations_JK_081213.pdf  
  AdditionalUploadsQueTwo No access No access mini_stable_II_frame.jpg  
  DeckPlan No access No access Deck_Layout_DY030b.pdf  
  GeneralInformationTwo No access No access mini_stable_II_frame.jpg  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  741
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    Autosub6000 Rev0 UKORS OPS Autosub6000_Rev0_complete.doc
    Box Coring Rev2 UKORS OPS Box_Coring_Rev2_complete.doc
    CTD Operations Rev 5 UKORS OPS CTD_Operations_Rev_5_complete.doc
    Emergency Grapnel Recovery Rev1 UKORS OPS Emergency_Grapnel_Recovery_Rev1_complete.doc
    Liquid Nitrogen generator Rev 3 UKORS OPS Liquid_Nitrogen_generator_Rev_3_complete.doc
    Megacorer Rev0 UKORS OPS Megacorer_Rev0_complete.doc
    Moorings Operation Rev2 UKORS OPS Moorings_Operation_Rev2_complete.doc
    Stand Alone Pumps (SAPs) Rev 3 UKORS OPS Stand_Alone_Pumps_(SAPs)_Rev_3_complete.doc
    Winches Portable Deck Rev 3 UKORS OPS Winches_Portable_Deck_Rev_3_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  741
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access DY030_Post_Cruise_Assessment.pdf  
  Ships Cruise Debrief No access DY030_Post_Cruise_Assessment_Review_and_Action_Log_-_FINAL.pdf  
Top
Spacer.