This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 726    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


LATEST INFORMATION

PUBLIC  :

Cruise Planning Meeting will be held on Tuesday 1 December 2015 at the National Oceanography Centre, Southampton from 14:00 in the Board Room (036/10).




Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
726  JC136   2016     Kerry Howell   Jonathan Short   RRS James Cook   Rockall trough

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  726
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed View SME. Help icon.
Cost SME Closed Profile owner may log in and view SME Costing. Help icon.
Create Programme Closed View 2016 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete. Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  726
JC136
RRS James Cook
40Days
Rockall trough
Profile (726)
View SME
Howell
University of Plymouth
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
09-05-2016 14-05-2016 03-06-2016 23-06-2016 30-06-2016
MobPort Sail Port Mid Port Dock Port DeMob Port
GBSOU GBSOU GBSTO GBSOU GBSOU

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  726
Chemistry : Laboratory fume hood.
Laboratory laminar flow hoods.
Laboratory liquid nitrogen generator.
Laboratory pure water system (Millipore).
Seismics/Echo Sounders/Coring : Mega corer.
Sound velocity probe.
Deep Platforms : Autosub
ISIS 6500m remotely operated vehicle (ROV).
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
L ADCP RDI WH monitor 300kHz.
Moorings & mooring instrumentation
Salinometer.
SC ADCP RDI WH long ranger 75kHz (1500m).
SC ADCP RDI WH long ranger 75kHz (3000m).
SC ADCP RDI WH sentinel 600 kHz.
Miscellaneous : -20 degree centigrade freezer.
-85 degree centigrade freezer.
Ice making machine.
Refrigerators.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.
SIMRAD EA600/EA640 12 kHZ single beam echo sounder.
SIMRAD EM120 swath bathymetry system.
SIMRAD SBP 120 sub bottom profiler (3°).
SIMRAD shallow water multibeam (EM710).
SPD11 dynamic positioning system.
Ultra short base line (USBL) acoustic navigation system.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  726
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  726
System File Name Re/load Delete Uploaded File
  CruiseMapOne No access No access WorkingAreaSME1.jpg  
  DeckPlan No access No access JC136_Deck_Plan.pdf  
  GeneralInformationOne No access No access ADCP_JC136.pdf  
  MooringMapSmeOne No access No access MooringMapConnectivity.jpg  
  ResearchSummaryOne No access No access Figure1.jpg  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  726
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    Autosub6000 Rev0 Burris Autosub6000_Rev0_complete.doc
    CTD Operations Rev 5 Provost CTD_Operations_Rev_5_complete.doc
    ISIS operation Rev 2 Turner ISIS_operation_Rev_2_complete.doc
    Megacorer Rev0 Scott Megacorer_Rev0_complete.doc
    Millipore Rev 4 Scott Millipore_Rev_4_complete.doc
    Millipore Rev 4-coshh Scott Millipore_Rev_4-coshh_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  726
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access JC136_Post_Cruise_Assessment_evaluation_final_2016-06-28.pdf  
  Ships Cruise Debrief No access JC136_Moorings_Report.pdf  
  Post Cruise Reveiw Log No access JC136_PCA_review_log.pdf  
  Other No access Isis_Tech_-Report_JC136_Howell_NMF.pdf  
Top
Spacer.