This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 674    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
674  DY017   2014     Stuart Painter   Dan Comben   RRS Discovery   Outer Hebrides

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  674
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed View SME. Help icon.
Cost SME Closed Profile owner may log in and view SME Costing. Help icon.
Create Programme Closed View 2014 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete.
View Cruise Track.
Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  674
DY017
RRS Discovery
17Days
Outer Hebrides
Profile (674)
View SME
Painter
National Oceanography Centre
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
18-10-2014 20-10-2014 06-11-2014 06-11-2014
MobPort Sail Port Mid Port Dock Port DeMob Port
GBSOU GBSOU GBFAL GBFAL

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  674
Chemistry : Clean chemistry laboratory container.
Laboratory fume hood.
Laboratory laminar flow hoods.
Laboratory pure air gas generators.
Laboratory pure water system (Millipore).
Underway water sampling system (trace metal spec).
Seismics/Echo Sounders/Coring :  
Deep Platforms :  
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
CTD/rosette sampler systems (Titanium).
Salinometer.
Miscellaneous : -20 degree centigrade freezer.
-85 degree centigrade freezer.
Gas bottle storage racks.
Refrigerators.
User supplied laboratory container.
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Dartcom Satellite Imaging System
Gas distribution system to laboratory.
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship scientific computing systems.

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  674
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  674
System File Name Re/load Delete Uploaded File
  AdditionalUploadsQueOne No access No access OH_cruise_bathy_v5_pink.pdf  
  AdditionalUploadsQueTwo No access No access Near_Surface_Sampling_Buoy_Tom_Bell_and_Rich_Sims.pdf  
  CruiseMapOne No access No access OuterHebrides_cruise.pdf  
  DeckPlan No access No access DY017_deck_plan_2.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  674
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    CTD Operations Rev 5 UKORS OPS CTD_Operations_Rev_5_complete.doc
    Moorings Operation Rev2 UKORS OPS Moorings_Operation_Rev2_complete.doc

TABLE  :  POST CRUISE REPORT  -  for PROFILE  674
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access PCA_DY017.pdf  
  Ships Cruise Debrief No access File not loaded.
Top
Spacer.