This system has been replaced by a new version. Information contained on these pages will not be updated. Please visit www.marinefacilitiesplanning.com to access the replacement system.

NERC Homepage Spacer. Marine Facilities Planning
Spacer.
Spacer. Spacer. Spacer.
Active Profile  : 794 [2]    Stage    :  Complete
Last  :  The Post Cruise Reports have been uploaded.

Next  :  The Profile is complete.
User information Username :  [Log in here]  Role :  [Public]

Display Cruise Profile Summary Page


LATEST INFORMATION

PUBLIC  :

Cruise Planning Meeting will be held on Tuesday 15 December 2015 at the National Oceanography Centre, Southampton from 14:00 in the Red Library Meeting Room (125/02).
This is a child Profile of a multiple cruise profile which includes - 794 [1] 794 [2]

Ship-time and Marine Equipment Profile (or SME)

PROFILE CRUISE YEAR PI MANAGER SHIP LOCATION
794 [2]  DY054   2016     Penny Holliday   Dan Comben   RRS Discovery   OSNAP

Profile Progression

TABLE  :  PROFILE PROGESSION  -   for PROFILE  794 [2]
Profile
Stage
Completed
By
Actions
Available
   
Edit SME Closed A
P
P
L
I
C
A
T
I
O
N
Help icon.
Confirm Funding Closed Please refer to parent - [here]. Help icon.
Cost SME Closed This is a Multi-Profile. Help icon.
Create Programme Closed View 2016 Programme [List] [Chart] Help icon.
Confirm Acceptance Closed View Terms and Conditions. Help icon.
Edit Questionnaire Closed View Questionnaire. P
L
A
N
N
I
N
G
Help icon.
Risk Assessment Open Closed View Risk Assessments. Help icon.
Cost Questionnaire Closed Profile owner may log in and view QUE Costing. Help icon.
Edit Agreement Closed View Agreement. Help icon.
Cost Agreement Closed Profile owner may log in and view AGR Costing. Help icon.
Confirm Agreement Closed View the Agreement Acceptance. Help icon.
Edit CDSI Closed View CDSI. Help icon.
Accept CDSI Closed View CDSI. Help icon.
Risk Assessment Closed Closed View Risk Assessments. Help icon.
NERC Post Cruise Assessment Closed View Post Cruise Assessment. P
O
S
T
C
R
U
I
S
E
Help icon.
Raw Scientific Data Submission Closed View Raw Data. Help icon.
BODC Cruise Summary Report Closed View Cruise Summary Report. Help icon.
Final Cruise Report Closed View PI Final Cruise Report. Help icon.
Post Cruise Reports Closed View Cruise Reports. Help icon.
Complete NMF-SS Next : The Profile is complete.
View Cruise Track.
Help icon.

Profile Summary

TABLE  :  CRUISE ITINERARY  -  for PROFILE  794 [2]
DY054
RRS Discovery
21Days
OSNAP
Profile
(794 [2])
BARTER
Holliday
NOC
Mob Date Sail Date Mid Port Date Dock Date DeMob Date
25-07-2016 27-07-2016 17-08-2016 21-08-2016
MobPort Sail Port Mid Port Dock Port DeMob Port
ISREY ISREY GBSOU GBSOU

TABLE  :  EQUIPMENT LISTING   -   for PROFILE  794 [2]
Chemistry : Laboratory pure water system (Millipore).
Seismics/Echo Sounders/Coring : Echo sounder 10kHz (10/12 kHz fish and hull mounted system).
Deep Platforms :  
Sensors and Moorings : CTD/rosette sampler systems (Stainless Steel).
L ADCP RDI WH monitor 300kHz.
Moorings & mooring instrumentation
Salinometer.
Miscellaneous :  
Ship Fitted Equipment : 150 kHz hull mounted ADCP system.
75 kHz hull mounted ADCP system.
Dartcom Satellite Imaging System
Meteorology monitoring package.
Pumped sea water sampling system [hull bottom intake].
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter].
Ship Dynamic Positioning System.
Ship scientific computing systems.
SIMRAD EA600/EA640 12 kHZ single beam echo sounder.
SIMRAD EK60 echo sounder.
WAMOS wave radar

TABLE  :  FREIGHT REQUIREMENTS   -  for PROFILE  794 [2]
Transport
type
Transport
description
Dispatch
location
Dispatch
date
Destination Arrival
date
    No freight information has been input.

TABLE  :  COLLATERAL FILES  -  for PROFILE  794 [2]
System File Name Re/load Delete Uploaded File
  DeckPlan No access No access Discovery_Deck_Plan_DY054issue2.pdf  

TABLE  :  RISK ASSESSMENTS ASSIGNED A NOMINEE  -   for PROFILE  794 [2]
Risk Assessments are closed and can be download for use - [more].
Risk Assessment Name User Details Uploaded File
    No Risk Assessments have been assigned.

TABLE  :  POST CRUISE REPORT  -  for PROFILE  794 [2]
System File Name Re/load Uploaded File
(in new browser window)
  NERC Post Cruise Assessment (PCA) No access PCA_DY054.pdf  
  Ships Cruise Debrief No access File not loaded.
  Post Cruise Reveiw Log No access DY053_DY054_-_PCA_review_log.pdf  
  Other No access File not loaded.
Top
Spacer.