PART 1 : General Particulars    


NERC logo

Profile ID  :   1033
PS  :   Colin  Day
PI  :     
SME (General) Submission Date  :    09-07-2015
SME (Funding) Submission Date  :    09-07-2015

Ship-time & Marine Equipment Application Form (SME)

NOTES:
1. NERC's Marine Facilities Planning programme is planned on the basis of the financial year i.e. 1st April to 31st March. This Profile must have completed the Confirm Funding stage by the 1st April in order for it to be considered for inclusion in the following years programme. Submissions after the deadline date will be carried forward to the subsequent year, unless they can be satisfied on an opportunistic basis.

2. This form is NOT an application for funding, which must be applied for or obtained separately. The NERC policy for the allocation of 'superstructure' costs to grant proposals can be found in the guidance notes. Please check the NERC deadlines for SME submission dates at the applying for marine facilities page.

3. All applications for access to NERC's marine facilities must be submitted electronically via this web site. As the Profile progresses the Principal Investigator will be notified of the progress by automatically generated email alerts.

4. Assistance with the completion of this form can be found by clicking on the following icon - Help icon.. A new browser window will be opened containing context specific information.


If you have any enquires concerning details contained within these online forms please contact the following people:

Colin Day
NMFSS Programme Manager
Tel: 023 80596109
Fax: 023 80596267
E-mail:
Sally Heath
NMFSS Programme Support Officer
Tel: 023 80599238
Fax: 023 80596149
E-mail:
Randolph Sliester
Ships programme & Ops Manager
Tel: 01223 221456
Fax: 01223 362616
E-mail:
Beth House
Marine Planning Officer
Tel: 01793 442597
Fax: 01793 411545
E-mail:



PART 1 : General Particulars    SECTION A : Cruise details

1.  Principal scientist details SME  PART 1 : General Particulars
SECTION A : Cruise details
First name : Colin
Last name : Day
Your title : Programme Manager
Institution : National Oceanography Centre
Contact address :
Room 251/33 National Marine Facilities - Sea Systems
National Oceanography Centre
Empress Dock
European Way
Southampton
SO14 3ZH 
Post code : SO14 3ZH
Email : cdy@noc.ac.uk
Telephone : +44 23 80596109
Fax : +44 23 80596267
Mobile :
 
Is Principal Investigator a different person to the Principal Scientist?


2.  Title of project SME  PART 1 : General Particulars
SECTION A : Cruise details
Grant or project title
Repair 


3.  Programme details SME  PART 1 : General Particulars
SECTION A : Cruise details
NERC's Marine Facilities Planning programme is planned on the basis of the financial year i.e. 1st April to 31st March, therefore the year 2010/11 will run from the 1st April 2010 to the 31st March 2011.

If a project has a number of cruises which use different equipment on the cruise - separate applications must be made for each of the cruises. If a project has a number of cruises which all use the same equipment a single (multi-profile) application can be made. See the Marine Facilities Planning Guide - Multi-Profile for details. Help icon.
How many cruises do you anticipate in 2013/14
How many cruises do you anticipate in 2014/15
How many cruises do you anticipate in 2015/16
How many cruises do you anticipate in 2016/17 1
How many cruises do you anticipate in 2017/18
How many cruises do you anticipate in 2018/19
How many cruises do you anticipate in 2019/20
How many cruises do you anticipate in 2020/21


Please detail any specific outreach activities connected with this project SME  PART 1 : General Particulars
SECTION A : Cruise details
A description (approx 2-pages) of the research project to be carried out during the cruise must be provided. Please type or paste this information into the text area below.

This research project description will be used when creating the Programme.

Diagram or more detailed information (eg. papers) may be included as file uploads.
Research Summary Description :
Repair 
Multiple file upload
A number of files may be added. Files must be in the doc, gif, jpeg or pdf format, all diagrams to be gif or jpeg. The size of individual file uploads must not exceed - 150 Kilobytes. See the Marine Facilities Planning Guide - File Upload for details. Help icon.
Research Summary File Uploads : No files uploaded
If extra bandwidth is required on board ship, this will incur additional cruise costs
 


PART 1 : General Particulars    SECTION B : Cruise logistics

If you have not yet completed Section A.3 Program details this page will be empty.


1. Cruise timing - for the first cruise in 2016/17 SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Earliest acceptable science start date
Latest acceptable science end date
Please state clearly what your time constraints are and why.
 


2. Cruise period - for the first cruise in 2016/17 SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Preferred number of science days on-site (excluding passage to and from the site).
Minimum number of science days acceptable (excluding passage).


3.  Cruise working area SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Please give a general location: e.g. North Atlantic.
The four positions below should encapsulate the location of your working area.
General location : Repair
Point 1 - Latitude :
Point 1 - Longitude :
Point 2 - Latitude :
Point 2 - Longitude :
Point 3 - Latitude :
Point 3 - Longitude :
Point 4 - Latitude :
Point 4 - Longitude :
Please state your 'assumed' port of mobilisation :
Please state your 'assumed' port of demobilisation :
State reasons for the use of specific mobilisation or de-mobilisation ports
 
Multiple file upload.
Please upload a cruise map or maps of your working area. There is an example of a completed map - [here].
Images should be no larger than 720 pixels wide or 150 Kilobytes in size. For further information see the Marine Facilities Planning Guide - File Upload.  -   Help icon.
Cruise Map File Uploads : No files uploaded
Please include any other information relating to your cruise location here.
 


4.  Request for specific research ship. SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Please indicate which ship(s) are un/acceptable for your cruise, you may choose more than one ship.   See page 5 for details of ship fitted equipment.
See the guidance notes for details of barter arrangements with Ocean Facilities Exchange Group (European) or OCEANIC (USA) research ships. If a specific barter ship is required contact should be made with NERC Marine Planning to establish availability before submission of the SME.
RRS Discovery : Acceptable
RRS James Cook :
RRS James Clark Ross :
RRS Ernest Shackleton :
Other ship (if meets requirements)
Please state the reasons why a ship is unacceptable or for choosing a specific ship
 


5.  Number of berths required for the first cruise in 2016/17 SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Please indicate the preferred and the acceptable number of scientific berths (exclusive of NMF-SS technical support) that are required to deliver your science programme: In Part 2 Section B Technical Support Staff there are futher questions regarding NMF-SS manning and training berths.

Maximum Berth Numbers :
Discovery = 28; Cook = 31; JCR = 31; ES = 37;
Preferred number of scientist berths (exclusive of NMF-SS technical support).
Minimum number of scientist berths (exclusive of NMF-SS technical support).


6.  British Antarctic Survey SME  PART 1 : General Particulars
SECTION B : Cruise logistics
Is this an application for BAS core science?


1.  Chemistry SME  PART 1 : General Particulars
SECTION B : Cruise logistics
1.1 Radionuclide laboratory container.
1.1 Clean chemistry laboratory container.
1.1 General purpose chemistry laboratory container.
1.2 Ship fitted laboratory fume hood.
1.2 Ship fitted laboratory laminar flow hoods.
1.3 Laboratory hydrogen gas generators.
1.3 Laboratory pure air gas generators.
1.3 Laboratory nitrogen gas generators.
1.4 Laboratory liquid nitrogen generator.
1.5 Laboratory pure water system (Millipore).
1.6 Underway water sampling system (Trace Metal Spec).
1.7 Liquid scintillation counter.


2.  Seismics/Echo Sounders/Coring SME  PART 1 : General Particulars
SECTION B : Cruise logistics
2.1 Bolt 1500LL seismic airguns.
2.1 Multi-channel seismic systems.
2.2 Magnetometers.
2.2 Gravity meters.
2.3 Sub-bottom profiler (3.5 kHz echo sounder).
2.4 PES - Precision echo sounder 10kHz (10/12 kHz fish and hull mounted system).
2.5 Mini box corer (200mm square box).
2.5 Standard piston core system.
2.5 Long piston core system (Giant piston core).
2.5 SMBA multicore.
2.5 Gravity core.
2.5 NIOZ box corer (500mm square box).
2.5 SMBA box corer: stainless steel (500mm square box).
2.5 Kasten corer.
2.5 Mega corer.
2.5 Day grab.
2.5 Shipek grab.
2.6 Agassiz trawl systems.
2.6 OTSB trawl systems.
2.7 Seabed dredging.
2.9 Sound velocity probe (SVP).
2.10 Seismic compressor container.


3.  Deep Platforms. SME  PART 1 : General Particulars
SECTION B : Cruise logistics
3.1 Towed ocean bottom instrument (TOBI).
3.2 ISIS 6500m remotely operated vehicle (ROV).
3.3 Shrimp platform.
3.4 Bridget platform.
3.5 Autosub 3/Autosub 6000
3.6 Underwater gliders


NERC Moorings Policy SME  PART 1 : General Particulars
SECTION B : Cruise logistics
The NERC Moorings Policy is now in place.

Please ensure that you have read the policy and completed the moorings risk assessment if required.
The information can be found at www.nerc.ac.uk/research/sites/facilities/marine/guidance

Please upload your completed Risk Management forms here
See the Marine Facilities Planning Guide - File Upload for details. Help icon.
Moorings Risk Assessment Uploads: No files uploaded


4.  Sensors and Moorings. SME  PART 1 : General Particulars
SECTION B : Cruise logistics
4.0 Moorings & mooring instrumentation.
4.1 McLane moored profiling CTD systems.
4.2 Seasoar system.
4.3 CTD / rosette sampler systems (Stainless steel).
4.3 CTD / rosette sampler systems (Titanium).
4.4 Stand alone pumps (SAP).
4.5 Moving vessel profiler (MVP300).
4.6 CI FASTRACKA FRRF.
4.7 Scanfish.
4.8 Salinometer.
4.9 XBT/XCTD System.
4.10 10kHz Waterfall Monitoring System
4.11 SC ADCP RDI WH long ranger 75kHz (1500m depth rating - 2 off).
4.11 SC ADCP RDI WH long ranger 75kHz (3000m depth rating - 1 off).
4.11 SC ADCP RDI WH sentinel 300 kHz (6000m depth rating - 2 off).
4.11 SC ADCP RDI WH sentinel 600 kHz (6000m depth rating - 2 off).
4.11 SC ADCP RDI WH monitor 1200kHz (@500 depth rating - 2 off).
4.11 L ADCP RDI WH monitor 300kHz (6000m depth rating - 2 off).
4.12 Rockland VMP 5500 Deep Sea Microstructure Turbulence Profiler


5.   Miscellaneous SME  PART 1 : General Particulars
SECTION B : Cruise logistics
5.1 -85 degree centigrade freezer.
5.1 -20 degree centigrade freezer.
5.1 Refrigerators.
5.1 Ice making machine.
5.2 Gas bottle storage racks.
5.3 User supplied laboratory container.
5.4 User supplied storage container.
5.5 Cold storage container.
5.6 Clean air sampling


PART 2 : Technical Requirements    SECTION B : Ship Fitted Equipment

Ship fitted equipment SME  PART 2 : Technical Requirements
SECTION B : Ship Fitted Equipment
If you have not previously selected which ship you require or you have selected the Barter ship option then this page may be empty.



  1. Ship fitted Equipment SME PART 2 : Technical Requirements
SECTION B : Ship Fitted Equipment
150 kHz hull mounted ADCP system. Y
75 kHz hull mounted ADCP system. Y
Ship scientific computing systems. Y
Ultra short base line (USBL) acoustic navigation system. Y
Meteorology monitoring package. Y
Pumped sea water sampling system [hull bottom intake]. Y
WAMOS wave radar Y
Gas distribution system to laboratory. Y
Seismic air compressor. Y
Sea surface monitoring system [salinity, temperature, transmissometer, fluorimeter]. Y
D
I
S
C
O
V
E
R
Y
 




PART 2 : Technical Requirements    SECTION C : Full Equipment Description

Further details on some previously selected equipment. SME  PART 2 : Technical Requirements
SECTION C : Full Equipment Description
Some equipment requires no further information to be provided at this time - This page may be empty.


PART 2 : Technical Requirements    SECTION D : User Supplied Equipment

1.  User Supplied Equipment SME  PART 2 : Technical Requirements
SECTION D : User Supplied Equipment
Please itemise the main items of equipment outside the NMF-SS equipment pool to be used during the cruise (i.e. over-side equipment, laboratory equipment, specialist containers etc).
Name and equipment description.
Repair 


PART 2 : Technical Requirements    SECTION E : Additional Facilities

1.  Additional facilities. SME  PART 2 : Technical Requirements
SECTION E : Additional Facilities
In addition to research ships, NMF-SS technicians and NMEP equipment, NERC provides a range of facilities to support environmental research (see 'NERC Services & Facilities' website - here - for further information) and NERC has access to a number of marine facilities via the barter arrangements with IFREMER (France), BMBF (Germany) & NSF (USA) (see the NERC marine planning website for more information). Please indicate below which, if any, of the additional facilities you may require to support the research, should the cruise be programmed.
Please add any further comments as required.
 


PART 3 : Funding and Approval    SECTION A : Funding Option

1.  Details of funding SME  PART 3 : Funding and Approval
SECTION A : Funding Option
At this stage you MUST have already secured funding or be in the process of submitting an application for funding to cover the ‘superstructure’ costs association with your cruise i.e. NMF- SS or BAS technical support and equipment costs. You DO NOT presently require confirmation that your funding has been approved in order to progress to the next stage of this process - only to supply us with details about your funding application. Please note that until you have confirmed your funding your application WILL NOT be included in the planning process. Please help us by completing this information as soon as you have received notification that you have received funding. Please note that it is the responsibility of the Principal Scientist to ensure that the Project always has sufficient funding to meet the costs which are being indicated.

Marine Facilities Planning Web Site Guide Help icon. More information about editing the SME - [here].
Please indicate where you applied / are applying for funding by completing one of the following sections :
Funding from NERC.
Funding from non-NERC source. Yes


5.  Funding from non-NERC source. SME  PART 3 : Funding and Approval
SECTION A : Funding Option
Has any peer-review been undertaken on the application? Yes
Please provide details of this non-NERC funding
Repair 






PART 3 : Funding and Approval    SECTION B : Funding Confirmed

1.  Details of confirmed funding SME  PART 3 : Funding and Approval
SECTION B : Funding Confirmed
Please help us by completing your funding information at your earliest possible convenience. Also note that until you have confirmed your funding your application WILL NOT be included in the planning process.

A provisional cruise costing based upon the information which you have supplied in the SME (Technical & General) may already have been uploaded into the Profile. Please let us know if you are waiting for a costing to be produced - [here].

Please note that it is the responsibility of the Principal Scientist to ensure that the Project always has sufficient funding to meet the costs which are being indicated.
I have received confirmation that the funding has been allocated to meet the requirements outlined in this SME. Yes
Please indicate the amount of funding which has been allocated to meet your SME requirements (for Standard grants please enter 'na').
Repair